Maintenance Plumbing apartment steps
Maintenance Plumbing apartment steps Must lock stopcock architecture before starting in the stopcock decoder apartment. Usually the stopcock the apartment has been installed using the for Accor assembly where conducted immediately after the stopcock apartment in order to facilitate decoding valve, as well as decoding pipeline to replace a damaged part of it. Therefore you must start Lacour assembly first. This using Faransawy key or key English if I could not be used to run the Central nut (large) in the direction of the jaw (counter-clockwise) or down if the pipe line horizontally. After decoding nut assembly compilation of shows us both partial compilation of so that it can decode the caller Stopcock after work Linking tool to exclude this part away from the counterpart and complement humorous (and if you can not use the key Faransawy in the jaw due to the lack of space is used kirosen or Abannsh Alclabh). Then FAFSA nobility and valve. Accor has been used t